Subsidies for Farmers

Subsidies for Farmers

''The government is providing subsidy to farmers for following interventions being promoted by On-Farm Water Management wing of Agriculture Department.

 

Installation of High Efficiency (Drip/Sprinkler) Irrigation System (HEIS)

''
Name of Project Government Share (Subsidy) Farmers' Contribution Project Area
Punjab Resilient and Inclusive Agriculture Transformation (PRIAT)
(2022-23 to 2026-27)

It is planned to demonstrate high efficiency irrigation systems in the project area for the promotion of high value crops, including orchards, vegetables, and other cash crops, based on sitespecific requirements. Keeping in view the socio-economic and financial capacity of the farming community, the following sliding scale cost sharing formula will be implemented.

Acreage Slab Govt. Share/ Subsidy Farmers’ Contribution
0 - 7.5 acres 75%   25% 
 7.6 to 12.5 acres 60% 40%

For example, if a farmer wants to install the system on 12.5 acres, he will get 75% subsidy upto 7.5 acres, while the subsidy on remaining 5 acres (7.6 to 12.5 acres) will be 60%.

Remaining cost

Entire Punjab

       
Command Area Development of Jalalpur Irrigation Project (CAD-JIP)
(2019-20 to 2023-24)
The government provides 80 percent of total system cost for installation of HEIS upto 15 acres Remaining 20 percent Khushab and Pind Dadan Khan tehsils
       
Transformation of Agriculture in Pothohar (2025-27 to 2027-28) The government provides 70 percent of total system cost for installation of Solar coupled HEIS, maximum upto 3,85,000/- per acre. Remaining 30 percent or more over and above the government subsidy. Attock, Chakwal, Jhelum and Rawalpindi districts

Improvement of Watercourses

''
Name of Project Government Share(Subsidy) Farmers' Contribution Project Area
Punjab Resilient and Inclusive Agriculture Transformation (PRIAT)
(2022-23 to 2026-27)
The government provides entire cost of construction materials besides technical assistance

The beneficiary farmers contribute entire labour costs for improvement of unimproved watercourses and completion of partially improved watercourses for following activities.

  • Demolishing and reconstruction of katcha watercourse
  • Excavation for the portion to be lined
  • Back earth filling of structures and lined section
  • Masons and unskilled labour for all civil works
Entire irrigated areas of the Punjab

Chief Minister’s Program for Water Efficient Agriculture (2025-27 to 2027-28)

Command Area Development of Jalalpur Irrigation Project (CAD-JIP) (2019-20 to 2022-23) Government will bear entire cost for earthen construction of watercourse and all construction materials Farmer will contribute their requisite share for labour and mason costs for installation of water control structures, construction of  culverts/ animal wallow / drop structures, lining of critical sections and back earth filling of water control structure and lined sections of watercourse Khushab and Pind Dadan Khan tehsils
Transformation of Agriculture in Pothohar (2025-27 to 2027-28) The government provides entire cost of construction materials besides technical assistance

The beneficiary farmers contribute entire labour costs for improvement of unimproved watercourses and completion of partially improved watercourses for following activities.

  • Demolishing and reconstruction of katcha watercourse
  • Excavation for the portion to be lined
  • Back earth filling of structures and lined section
  • Masons and unskilled labour for all civil works
In Command of 15 small Dams

Rehabilitation/Development of Irrigation Schemes

Irrigation schemes are watercourses of tubewells or other water sources in non-canal commanded areas.

Name of Project Government Share Farmers' Contribution Project Area

Punjab Resilient and Inclusive Agriculture Transformation (PRIAT)
(2022-23 to 2026-27)

Government provides cost of construction materials maximum of Rs.500,000/- Remaining material cost and labour charges Non-canal commond area in the Punjab
''

Provision of LASER Land Levelers to the Farmers/ Service Providers

Name of Project Government Share Farmers' Contribution Project Area

Chief Minister’s Program for Water Efficient Agriculture (2025-27 to 2027-28)

One time financial assistance of Rs. 600,000 per unit

Remaining cost of LASER unit

Entire Punjab
       

Transformation of Agriculture in Pothohar (2025-27 to 2027-28)

One time financial assistance of Rs. 700,000 per unit -do- Attock, Chakwal, Jhelum and Rawalpindi
''

 LASER Land Levelling in Watercourse Commands

Name of Project Government Share (Subsidy) Farmers' Contribution Project Area

Command Area Development of Jalalpur Irrigation Project (CAD-JIP) (2019-20 to 2022-23)

Government provides  financial assistance @ Rs. 4,800 per acre (80%) for LASER land leveling . Remaining 20 percent cost @ Rs. 1,200 per acre or more over and above the government subsidy Khushab and Pind Dadan Khan tehsils
''

Construction of On-Farm Water Storage Ponds/ Tanks

Name of Project Government Share Farmers' Contribution Project Area
Command Area Development of Jalalpur Irrigation Project (CAD-JIP) (2019-20 to 2022-23) Government provides 80 percent of total system cost (water storage pond + solar powered pumping stations) Remaining 20 percent cost Khushab and Pind Dadan Khan tehsils
Punjab Resilient and Inclusive Agriculture Transformation (PRIAT)
(2022-23 to 2026-27)
The government provides 70 percent of total system cost up to 900,000/- for construction of water storage pond on HEIS sites, if needed, on the basis of site- specific technical requirements Remaining 30 percent or more over and above government subsidy. Entire Punjab

Installation of Solar Systems for Operating  High Efficiency Irrigation Systems (HEIS)

Name of Project Government Share Farmers' Contribution Project Area

Punjab Resilient and Inclusive Agriculture Transformation (PRIAT)
(2022-23 to 2026-27)

It is planned to provide the solar sytem to operate the high efficiency irrigation systems in the project area based on sitespecific requirements. Keeping in view the socio-economic and financial capacity of the farming community, the following sliding scale cost sharing formula will be implemented.

Acreage Slab Govt. Share/ Subsidy Farmers’ Contribution
0 - 7.5 acres 75%   25% 
 7.6 to 12.5 acres 60% 40%

     For example, if a farmer wants to install the system on 12.5 acres, he will get 75% subsidy upto 7.5 acres, while the subsidy on remaining 5 acres (7.6 to 12.5 acres) will be 60%.

Remaining  cost of the system Entire Punjab
       

 

Government provides upto maximum of Rs. 480,000 of total cost for installation of solar powered pumping system at dugwell site, if the cost of solar pumping system exceeds Rs. 800,000 while the government will provide 60 percent of the cost when the total cost is below Rs. 800,000    

Development of Solar coupled Lift Irrigation Schemes 

Name of Project Government Share Farmers' Contribution Project Area

Transformation of Agriculture in Pothohar (2025-27 to 2027-28)

Government provides 70% of total per acre cost, maximum upto 1.3 million under farmer purchase model Remaining cost Attock, Chakwal, Jhelum and Rawalpindi
''

Development of Supply Chain Infrastructure (Value Addition) 

Name of Project Government Share Farmers' Contribution Project Area

Punjab Resilient and Inclusive Agriculture Transformation (PRIAT)
(2022-23 to 2026-27)

Government provides 70 percent subsidy Remaining cost Entire Punjab

Promotion of Fruit Plants, Oilseeds/ Pulses Crops & Fodder /Forage/ Range

(To be implemented through Extension wing of Agriculture Department)

Demonstration and Extension Services under Command Area Development of Jalalpur Irrigation Project

(To be implemented through Extension wing of Agriculture Department)

Activities Government Share
(Per unit)
Farmers' Contribution '''''Project Area

Demonstration Plots of

    Khushab and Pind Dadan Khan tehsils

Field Crops
Vegetables
Orchards

Upto Rs.35,000/-
Upto Rs.52,000/-
Upto Rs.85,000/-

Remaining cost
-do-
-do-

 
Provision of Hand Sprayers Upto Rs.4,000/- -do-  
Provision of Rabi Drills Upto Rs. 45,000/- -do-